Peer Review Analyses

TRAFFIC

Peer Reviewer: Brian Beisel PE and Kien Ho, PE, PTOE, BETA Engineers (Norwood, Mass.)

Traffic and Public Safety - BETA Engineers - March 20, 2014
Police Chief Daniel O'Leary - March 17, 2014
> Description: Comments on BETA's Initial Traffic Peer Review
Response to BETA Peer Review from MDM, transportation consultants for the Applicant.
a. MDM Response to BETA - April 29, 2014
b. MDM Response to BETA--Appendix - April 29, 2014
Traffic and Public Safety - Follow-Up Report - BETA Engineers - May 8, 2014
OLD_Updated Traffic Report - MDM - July 2, 2014
AMENDED_Updated Traffic Report - MDM - July 17, 2014 (replaces July 2 document):
Traffic Study Memorandum (p. 22 is highlighted to show what was amended)
Traffic Study Attachments
Traffic and Public Safety Peer Review Report - BETA Engineers - August 28, 2014

Traffic and Public Safety Peer Review Report - BETA Engineers - October 14, 2014

Response to Abutter Concerns - October 15, 2014

STORMWATER

Peer Reviewer: Philip Paradis, PE, BETA Engineers (Norwood, Mass.)

Stormwater and Drainage - BETA Engineers - April 2, 2014
Conservation Commission - April 8, 2014
> Description: Comments on BETA's Stormwater Peer Review
Stantec Response to BETA's Initial Peer Review - July 11, 2014
Updated Stormwater Report from Stantec - July 11, 2014
Updated Stormwater Report from Stantec - August 22, 2014
Civil Engineering and Stormwater Management Peer Review - BETA - September 11, 2014

Response to Abutter Concerns - October 15, 2014

Stormwater Management Report (Stantec, Inc.) - Revised December 11, 2014
> Cover Letter from Frank Holmes with overview of revisions - December 11, 2014

SITE/BUILDING DESIGN

Peer Reviewer: Theodore Touloukian, AIA, Touloukian Touloukian (Boston, Mass.)

June 19, 2014 Hearing: Mr. Touloukian described his role to the ZBA.
Please see the June 19 hearing transcript for his comments.

June 23, 2014 Hearing: Mr. Touloukian presented his preliminary report to ZBA.
Design Peer Review Powerpoint
Site/Building Design Peer Review: Outline of Speaking Points -  July 23, 2014

September 8, 2014 Hearing: Mr. Touloukian presents his final report to ZBA.
Site/Building Design Peer Review: Final Report - September 5, 2014
Chestnut Hill Realty's Response to Peer Review

Also See "Letters to ZBA"
Also See "Testimony Before ZBA--Powerpoint Presentations" and "ZBA Hearing-Minutes and Transcripts"