Skyline Park Field Replacement

Aerial photo of Skyline Park and field.

Skyline Park, a popular park within the Town of Brookline, is part of the 15-acre site of a former landfill that was closed and capped through a MassDEP landfill closure process and made into a public park in 2008. Skyline Park is located on the top of the former front landfill, and slopes away on all sides with a connection to the Lost Pond Sanctuary. The current park includes a children’s playground, walking paths, a picnic pavilion, restroom facility, parking area and a synthetic turf field.  This project addresses replacement of the existing synthetic turf field only.  The current field is surfaced by synthetic turf/ SBR rubber infill system that was installed during the original park completion in 2008. It is nearing the end of its serviceable life. The existing rectangular field is approximately 255-ft by 390-ft, and is primarily used for soccer and rugby.  

We invite you to participate in our REMOTE public design review process for the renovation of field at Skyline Park.   The kick-off meeting is an opportunity to talk about existing conditions and the replacement of the synthetic field. 

Skyline Park Synthetic Turf Replacement Kick Off Meeting #1 

January 31, 2022 from 6:00-8:00pm    

Join online via zoom: https://brooklinema.zoomgov.com/webinar/register/WN_GulFNx9pTwaW3DvCz8gEnw                                         Join by phone: US: 1-669-254-5252 or 1-646-828-7666                                                                                                                                               Webinar ID: 161 982 9486      Passcode: 47061039

Skyline Park Synthetic Turf Replacement Meeting #2

February 16, 2022 from 6:00-8:00pm    

Join online via zoom: https://brooklinema.zoomgov.com/webinar/register/WN_rYzSviXCQWWCZCezLUFi1w                                            Join by phone: US: 1-669-254-5252 or 1-646-828-7666                                                                                                                                             Webinar ID: 160 077 3239      Passcode: 56895752

Skyline Park Synthetic Turf Replacement Meeting #3

March 6, 2022 from 6:00-8:00pm    

Join online via zoom: https://brooklinema.zoomgov.com/webinar/register/WN_-Yt8EqgOQZ6q91D1S2etxw                                                  Join by phone: US: 1-669-254-5252 or 1-646-828-7666                                                                                                                                           Webinar ID: 161 634 0882      Passcode: 37353788