Less than 50% of the existing structure area (SF) is being altered.

The project does not require site plan review by DPW-Engineering Division. Work with Building Department for permit approval.

Show All Answers

1. Less than 50% of the existing structure area (SF) is being altered.
2. 50% or more of the existing structure area (SF) is being altered.