Partial demolition of an existing structure (LESS THAN 50% of the existing structure area (SF) is being altered).

The project does not require site plan review by DPW-Engineering Division. Work with Building Department for permit approval.

Show All Answers

1. Complete demolition of an existing structure
2. Partial demolition of an existing structure (LESS THAN 50% of the existing structure area (SF) is being altered).
3. Partial demolition of an existing structure (50% OR MORE of the existing structure area (SF) is being altered)